An in-built safety system designed to bring a wind turbine to a safe stop failed and ultimately led to its collapse at a Welsh valleys wind farm, its been confirmed. The Nordex-designed 300ft wind turbine crashed to the ground at Gilfach Goch
Source: Huge 300ft turbine that crashed to the ground had spun too fast, investigation concludes