Wind Industry Victims Vindicated: Endless Noise Complaints Force Giant Wind Farm Shutdown in Ontario

STOP THESE THINGS

Finally, Huron County farmers driven nuts by incessant wind turbine noise have forced the shut down of their giant industrial tormentors.

Ontario’s government has been in bed with the wind industry from the beginning, ignoring, bullying and berating wind farm neighbours with the temerity to complain about the grinding, thumping cacophony dished up by these things on a daily basis. Now, finally, after years of fighting simply to be heard, Ontario’s farmers are getting a taste of what representative and responsible government might look like.

In a result that couldn’t come soon enough for the Huron County farming families forced to live with it, an Order has just been made shutting down 140 turbines near Ashfield-Colborne-Wawanosh. The order was made simply because their operator, K2 Wind can’t comply with the conditions of its planning permit or even Ontario’s (extremely lax) noise regulations. Needless to say, the local farmers’ delight is…

View original post 822 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s