China’s Plans For Wind Power

The 10-year wind power outlook for China consists of steady annual capacity additions from 2017 to 2026 resulting in a cumulative grid-connected capacity of 403GW by the end of 2026. Annual grid-connected capacity from 2017 to 2020 will be less than 25GW due to curtailment and policy restraints. However, annual grid-connected capacity will increase post-2020, benefiting from an expanded availability of grid capacity.

Source: China’s Plans For Wind Power

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s