Wind power fails in Canada – a 23 year life span not likely to be replaced

Watts Up With That?

From the Calgary Herald and the “waiting of the government cash cow” department:

Oldest commercial wind farm in Canada headed for scrapyard after 23 years

By: DAN HEALING, CALGARY HERALD

A line of turbines on metal lattice legs catch the breeze at the Cowley Ridge wind farm in southern Alberta. The 23-year-old facility, Canada’s first commercial wind project, is being decommissioned. TED RHODES / CALGARY HERALD

The oldest commercial wind power facility in Canada has been shut down and faces demolition after 23 years of transforming brisk southern Alberta breezes into electricity — and its owner says building a replacement depends on the next moves of the provincial NDP government.

TransAlta Corp. said Tuesday the blades on 57 turbines at its Cowley Ridge facility near Pincher Creek have already been halted and the towers are to be toppled and recycled for scrap metal this spring. The company inherited the now-obsolete facility, built between 1993 and 1994, as part of its $1.6-billion hostile…

View original post 139 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s