US Wind Farm Litigation: Update on the Falmouth Case

STOP THESE THINGS

judges-gavel And then the hammer came down …

****

Back in November 2013, we reported on the orders made by a Court in Falmouth, Massachusetts that pulled to a halt the operation of a couple of giant fans that have been driving townspeople nuts since they kicked into gear over 5 years ago (see our post here).

We’ve also reported on Barry Funfar, a former Marine whose own country has forsaken him and his family, by aiding and abetting the local wind power outfit to ride roughshod over the rules; and decent Americans, like Barry (see our post here).

Here’s an update from Frank Haggerty of the Falmouth Patch.

Falmouth Wind Turbine Lawsuit Explanation: Town of Falmouth Avoided Special Permit Bylaw 240-166
Frank Haggerty
Falmouth Patch
20 March 2015

The Town of Falmouth placed two massive commercial wind turbines at the Falmouth waste water treatment plant. The two turbines…

View original post 463 more words

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s